Shopping List
Loading...
Loading...

Metered eConnect PDU

90 Options
Customize Your Product
Phase
Cabinet Compatibility
Explore Sizes & Options
Product No.Add to List
E1-2089-E
View Details
IEC60309 100A 3P+E
(30) C13 Locking + (12) C19 Locking Outlets
208V
Three-Phase
100A
28.8kW
42U & Higher
Glacier White
N/A
E1-2089-CE
View Details
IEC60309 100A 3P+E
(30) C13 Locking + (12) C19 Locking Outlets
208V
Three-Phase
100A
28.8kW
42U & Higher
1 Black + 1 Glacier White
N/A
E1-2089-C
View Details
IEC60309 100A 3P+E
(30) C13 Locking + (12) C19 Locking Outlets
208V
Three-Phase
100A
28.8kW
42U & Higher
Black
$2,592.50
E1-2192-C
View Details
IEC60309 100A 3P+N+E
(12) C13 Locking + (24) C19 Locking Outlets
220-240/380-415V
Three-Phase
100A
57.5kW
45U & Higher
Black
$3,252.10
E1-2192-CE
View Details
IEC60309 100A 3P+N+E
(12) C13 Locking + (24) C19 Locking Outlets
220-240/380-415V
Three-Phase
100A
57.5kW
45U & Higher
1 Black + 1 Glacier White
$6,373.30
E1-2192-E
View Details
IEC60309 100A 3P+N+E
(12) C13 Locking + (24) C19 Locking Outlets
220-240/380-415V
Three-Phase
100A
57.5kW
45U & Higher
Glacier White
$3,252.10
E1-2011-C
View Details
AC Terminal Block 3P4W
(30) C13 Locking + (12) C19 Locking Outlets
208V
Three-Phase
100A
28.8kW
42U & Higher
Black
N/A
E1-2011-E
View Details
AC Terminal Block 3P4W
(30) C13 Locking + (12) C19 Locking Outlets
208V
Three-Phase
100A
28.8kW
42U & Higher
Glacier White
N/A
E1-2010-E
View Details
IEC60309 60A 3P+N+E
(30) C13 Locking + (12) C19 Locking Outlets
220-240/380-415V
Three-Phase
60A
34.5kW
42U & Higher
Glacier White
N/A
E1-2010-C
View Details
IEC60309 60A 3P+N+E
(30) C13 Locking + (12) C19 Locking Outlets
220-240/380-415V
Three-Phase
60A
34.5kW
42U & Higher
Black
N/A
E1-2002-E
View Details
NEMA L5-30P
(24) 5-20 Standard Outlets
120V
Single-Phase
30A
2.9kW
42U & Higher
Glacier White
$985.29
E1-2011-CE
View Details
AC Terminal Block 3P4W
(30) C13 Locking + (12) C19 Locking Outlets
208V
Three-Phase
100A
28.8kW
42U & Higher
1 Black + 1 Glacier White
N/A
E1-2010-CE
View Details
IEC60309 60A 3P+N+E
(30) C13 Locking + (12) C19 Locking Outlets
220-240/380-415V
Three-Phase
60A
34.5kW
42U & Higher
1 Black + 1 Glacier White
N/A
E1-2002-CE
View Details
NEMA L5-30P
(24) 5-20 Standard Outlets
120V
Single-Phase
30A
2.9kW
42U & Higher
1 Black + 1 Glacier White
$1,931.15
E1-2004-C
View Details
NEMA L6-30P
(24) C13 Locking Outlets
208V
Single-Phase
30A
5kW
42U & Higher
Black
$801.13
E1-2004-CE
View Details
NEMA L6-30P
(24) C13 Locking Outlets
208V
Single-Phase
30A
5kW
42U & Higher
1 Black + 1 Glacier White
$1,570.21
E1-2004-E
View Details
NEMA L6-30P
(24) C13 Locking Outlets
208V
Single-Phase
30A
5kW
42U & Higher
Glacier White
$801.13
E1-2001-E
View Details
C20 Inlet to NEMA L5-20P
(24) 5-20 Standard Outlets
120V
Single-Phase
20A
1.9kW
42U & Higher
Glacier White
$818.24
E1-2002-C
View Details
NEMA L5-30P
(24) 5-20 Standard Outlets
120V
Single-Phase
30A
2.9kW
42U & Higher
Black
$985.29
E1-2001-CE
View Details
C20 Inlet to NEMA L5-20P
(24) 5-20 Standard Outlets
120V
Single-Phase
20A
1.9kW
42U & Higher
1 Black + 1 Glacier White
$1,603.76
Product Description

Metered eConnect® PDUs feature a local display for easy reading of input current to help with initial installation and properly balanced operations.

Key Features and Benefits
  • Resistance to High Temperature – Marketleading temperature ratings of up to 149°F (65°C) ensures reliability when mounted toward hot aisles.
  • Simplified Load Balancing – Phase-balance outlets on three-phase models ensure equal loading across all phases; allows use of shorter equipment power cords for better cable and airflow management.
  • No Accidental Disconnections – Patented, low-profile locking outlets prevent accidental disconnections without requiring special cords.
  • Easy Identification of Failover Unit – Redundancy Pack includes 2 PDUs (one in Black and one in Glacier White) for easy identification of the primary and secondary unit.
  • Latest UL Compliance – Meets UL and IEC 62368 for compliance with new listing requirements for North America and the European Union.
  • Cabinet Preinstallation – Complete ecosystem ships ready for IT equipment integration, and saves deployment time and reduces packaging waste.
  • High Power Configurations – Configurations supporting up to 100A Input provide an optimized solution for GPU & AI based applications. 30A branch circuit breakers provide flexibility when plugging high power IT equipment.