February 17, 2015

Learn how CPI's eConnect Intelligent PDUs helped this school to provide one tablet to each of their students, to be used as learning tools. 

February 09, 2015

Seismic areas require specific building codes and installation requirements to ensure the safety of people and equipment. Seismic products that will be installed in these buildings must also comply with stringent guidelines. 

In today's post, find out how Chatsworth Products' seismic cabinet meets stringent testing and is OSHPD approved.

January 13, 2015

Planning a data center in a seismically active area requires careful consideration on many levels.   

This is especially important in telecommunications/equipment rooms and data centers that cannot afford to be offline or are not backed up at a secondary location.

Today's post cover's our list of Top Five Considerations.

October 14, 2014

Z4-Series SeismicFrame CabinetA 7.4-magnitude earthquake hit the coast of El Salvador on Oct.14, near the municipality of Intipuca. Power in the city was down and a local hospital suffered light structural damages. Hospitals and emergency management agencies must continue to be operational, especially during and after an earthquake, so a reliable seismic-rated cabinet to protect equipment is a must. Read on to learn more...

October 07, 2014

Deploying the right cable management accessories makes maintenance, troubleshooting, moves, adds and changes a lot easier. A Finger Cable Manager, for example, attaches to the equipment mounting rail to create a pathway for cables next to the rail. Chatsworth Products (CPI) recently added a shorter version of its Finger Cable Manager, for those with fewer cables to manage. Full story below...

August 13, 2014

Chatsworth Products’ (CPI) Sr. Data Center Consultant, Steven Bornfield, has helped many customers through the process of consolidation and states that one of the biggest challenges is that, many times, most data center layouts are outdated because they were generated when the space was built years before. Here's a list of what you need for your consolidation project...

May 13, 2014

All rack-mount equipment can be installed in either a wall rack, wall cabinet or zone enclosure. But which one is right for your needs? Get the answer here...

May 09, 2014

What is the difference between an Evolution g1 Single-Sided, and Evolution g2 Double-Sided and an Evolution g3 Combination Vertical Cable Manager? The answer is here...
|<  <   ... 11 12 13 14 15 16 17 18 19 20 ...   >  >| Pages: 16 of 21
Search the CPI blog
Categories
Archives
Year
Month
Get Blog Updates
Stay up to date on latest news and solutions.